New Construction Shower Doors In Auburn Hills, MI
Glass is one of the last trades through the door, which is exactly why it belongs in the conversation early. Where the measure sits in your schedule, and what stalls a bathroom at the end of a build.
Glass Goes In Last, So Settle It First
On a house going up in Auburn Hills, the shower enclosure lands near the end. Paint is on, tile is set, the fixtures are trimmed. That position is misleading. Almost nothing about the glass is actually decided at the end. It is decided months earlier in framing, in the pan, in where the valve landed and how the tile was laid, and by then the opening either works for glass or it does not.
One rule governs the sequence: the enclosure is measured off finished tile, never off a plan and never off bare studs. Drawings say what an opening was meant to be. Glass is cut to what it turned out to be, wall by wall, because walls lean and tile carries thickness. So the measure slots in after tile, grout and the curb are done. Ask for one while the tile setter is still on site and the numbers will be wrong.
What you are choosing is a system, not a door. A clean run of frameless shower doors in Auburn Hills asks more of the framing and the tile than a unit with a slim frame does, so pick it while a wall can still be opened. Where a shower has a return, a bench or more than one panel, it becomes a custom glass shower enclosure in Auburn Hills built to the numbers the room gives us. The full list sits on the Auburn Hills shower doors page.
What The Glass Needs From The Trades Ahead Of It
Blocking Decided While Walls Are Open
Heavy glass hangs off hinges, and hinges want solid backing behind the tile. Blocking added during framing costs a stud and a few screws. Added after tile, it means opening a finished wall in a house you are trying to close out. Mark the hinge wall on the plan and put wood behind it.
A Curb And Pan That Read Level
Waterproofing, the pan, the slope and the curb belong to the tile trade, and the glass sits on whatever they leave. A curb that pitches outward, one crowned in the middle, or a sill wider at one end all show up later as a gap under a door. Put a level on it first.
One Spec, Written Down Once
A house with three baths should not need three hardware conversations. Fix the glass, the hardware and the finish once, note it on the selection sheet, and hand that sheet back at every measure. We bring samples in a full range of finishes, so the choice happens in the room.

Where The Measure Belongs In Your Schedule
The order that keeps a bathroom from stalling is simple, but it has to be respected. Framing and blocking, plumbing rough, waterproofing and the pan, tile set and grouted, curb finished, then the measure. The glass goes in after the painters, after floor protection is down, and after anyone who could scratch a panel has finished. Pulling it earlier gains nothing, because a panel cut to an unfinished wall stops fitting the moment that wall is finished.
Access matters more on a build than people expect. Somebody has to let the crew in, the bathroom has to be clear, and the room needs light and power. Long panels also have to travel from the truck to the bathroom, so a tight stair turn is worth mentioning before install day. Our family measures, fabricates and installs, so whoever took the numbers sets the panels, and the glass shower door installation in Auburn Hills ends with the seals, the hardware and the whole enclosure checked before we leave. Where a slim frame suits a secondary bath, semi-frameless shower doors in Auburn Hills ask less of the opening.
- Blocking set behind the hinge wall during framing
- Curb and pan finished, level checked before the measure
- Tile set and grouted before anybody takes a number
- Finish and hardware chosen before the measure, not after
- One written spec repeated across every bath in the house
- Glass set after paint, with the room clear and lit
Common questions.
When should we bring you in on a house that is still framed?
Two moments. The first is at framing, on paper, so blocking lands behind the hinge wall before anything closes up. The second is the measure itself, once tile and the curb are finished. The early conversation costs nothing and settles the decisions that are expensive to change later.
Can you measure off our plans or the tile layout?
No. Plans tell us what an opening was drawn to be, and glass has to meet what it turned out to be. Walls lean, tile carries thickness, and a curb can pick up pitch nobody intended. We take the numbers in person off the finished surfaces, because those are the dimensions the panels must satisfy.
The tile went in out of plumb. Does that stop the job?
Usually not. Older houses have been drifting quietly for years, and new work is tighter without ever being perfect. Glass gets built to the wall that exists, not the wall on the drawing. What changes is the recommendation: some walls are handled with hardware and seals, some are better served by a frame that absorbs the drift.
Who signs off on the selections, us or the buyer?
Whoever is choosing has to have chosen before the measure. If the buyer picks the finish and the layout, get that on the selection sheet first, because fabrication starts from the measure and the spec together. If you are choosing on their behalf, say so at the walkthrough and we work to your sheet.
There are three baths in the house. Do they all have to match?
They do not, and often they should not. The primary bath and the bath that takes daily traffic can carry different systems on purpose. What should match is the hardware finish and the way the spec is recorded, so nobody has to reconstruct later what went where.
Where does the enclosure fall on the punch list?
After the trades that could damage it. Paint, floors and final trim first, then the glass, then the walkthrough. The panels go in, the seals and hardware get set, and the enclosure is checked over before the crew leaves. Whatever we carried in leaves with us.