Fortune Shower Doors, Shower Doors and More (586) 315-8900
HomeSliding DoorsSwing DoorsHardwareGalleryContact Call (586) 315-8900
Bathroom Remodels · Washington Township, MI

Bathroom Remodel Shower Doors In Washington Township, MI

You are redoing one bathroom, the household still needs the rest of the house, and the enclosure is the item most often bought at the wrong moment. What has to be finished before a Washington Township opening can be measured, what gets settled at that visit, and what the crew needs from you on install day.

Call (586) 315-8900
Remodels in Washington Township

First Question: What Is Staying?

Two very different projects hide behind the words bathroom remodel, and glass behaves differently in each. In the first, the tile, the base and the curb all stay and only the enclosure changes. That is a shower door replacement in Washington Township. It starts with a measure of the opening exactly as it stands today, and the old unit and its frame leave with us on the truck when the new glass goes in.

In the second, walls come out. Demolition, moving the plumbing, waterproofing and the new pan all belong to other trades, then tile goes on and grout goes in. Only then does an opening exist to measure. Ordering the enclosure early, alongside the tile and the fixtures, is the most common way a remodel gets itself in trouble, because glass is cut to a room that does not exist yet on the day you would order it.

Washington Township is not one kind of house, and the two projects tend to land in different ones. An older bath often has an opening that has drifted out of square, and a frame around the perimeter carries that drift so the door still closes clean, which is why framed shower doors in Washington Township remain the right answer in plenty of rooms. A newer bath is likelier to have a layout no stock unit was ever built for. Our shower doors in Washington Township overview lays out every configuration we build for either one.

How we work with you

What Is Different When You Live There

01

The Old Enclosure Leaves With Us

When the new glass goes in, the old door and its frame come out and go on our truck. You are not left putting aluminum and broken glass out with the household trash. Where a contractor already took the old unit out during demolition, tell us at the visit, because the jambs and the curb underneath it are what gets measured.

02

Choose Hardware Next To Your New Faucet

A builder picks a finish off a schedule. You can do better than that. Have the new faucet, the shower trim and the cabinet pulls in the room when we come out, and look at the options in the light that bathroom actually gets. There is a full range of finishes, and the one that matches on a screen often does not match on the wall.

03

Access Is The Part People Forget

There are two visits rather than one, dimensions first and glass later, with fabrication sitting in the middle, and both need somebody there to open the door. We also want a clear path from your front door to the bathroom for full size panels, the room emptied of anything loose, and pets somewhere else while glass is moving.

Shower enclosure by Fortune Shower Doors in a Washington Township, Michigan bathroom
Sequencing

Living Around One Bathroom Being Out

The real cost of a remodel is the room being unavailable, and sequence beats speed at every point in the job. The temptation, once everything is torn up, is to have us measure early just to feel like something is moving. Numbers taken over unfinished tile are numbers we have to discard, and a panel cut from them will not sit in the room you finish with, so the shortcut costs you the very thing you were protecting.

Two decisions are worth making before the tile setter starts rather than after. One is the swing. Where a vanity, a toilet or the door into the room crowds the path a leaf would take, say so early, because sliding shower doors in Washington Township open in place and leave that floor clear. The other is what happens at the tub. Where the alcove keeps its tub and the shower runs over it, bathtub shower doors in Washington Township follow the same sequence as everything else: finished surfaces, then a measure, then glass.

  • Tell the tile setter that bare glass is coming
  • Plumb walls on every surface the enclosure touches
  • A level curb, pitched inward and tiled over
  • Grout in and cured before we take a dimension
  • Swing path walked against the vanity, toilet and door
  • Someone with decision authority present at both visits
Good Questions

Common questions.

We Are Only Changing The Glass. Is There Still A Measure?

Yes, and it is the whole job. Even where the tile and the base are untouched, every panel is cut to the opening in front of us, and an existing opening has usually moved a little since the day it was built. We take the numbers off what is there now, then build to them.

Can The Enclosure Be Ordered Up Front With Everything Else?

No, and it is the only item on the list that cannot be. A vanity, the fixtures and the tile are all bought off a plan. An enclosure is cut to a finished opening, and tempered glass cannot be trimmed after it is made, so that purchase waits until the tile work is behind you.

My Tile Date Is On The Calendar. When Do I Call?

Call when the date lands, not on the morning the grout dries. Getting the appointment booked early costs you nothing and puts it where you want it in the schedule. What cannot happen is taking numbers before the surfaces are finished, so the visit itself belongs after the tile is set and the grout is in.

The Bath Is Older And The Opening Has Drifted. Is That A Problem?

Usually not. Each wall that touches glass gets checked top to bottom and the panels are cut to the opening as it truly sits, and out of square is something we expect to find rather than a surprise. If the drift is far enough to show along a bare edge, you hear it at the measure and get the honest options, including a frame that absorbs it.

Can We Use The Shower As Soon As You Leave?

Not straight away. A silicone line runs along the glass and it needs to cure before water hits it. The crew will tell you how long that takes on your job before they leave. Treat the bathroom as still out of action for a stretch after the truck pulls off, and make other arrangements for that evening.

This Is Our Only Full Bathroom. Should We Do Anything Differently?

Keep the sequence tight and let nobody skip a step to feel faster. Have the measure the moment the tile work is genuinely finished, make every decision at that visit so nothing waits on a phone call afterward, and hold the install appointment where it is. Rushing the measure is what turns one bathroom down into two trips.

Washington Township, MI

Book It Around Your Tile Date

Text a photo of the opening if you want a first read, or book the free in-home measure once the tile work is done. A Washington Township remodel is measured, built and installed by the same family, out of the Sterling Heights showroom at 42624 Van Dyke Ave. Call (586) 315-8900, text (586) 800-9481, or email [email protected]. Mon to Fri 9 to 5, Sat 10 to 2.

Text Us a Photo Call (586) 315-8900
Text Us Call