Fortune Shower Doors, Shower Doors and More (586) 315-8900
HomeSliding DoorsSwing DoorsHardwareGalleryContact Call (586) 315-8900
New construction · Clawson, MI

New Construction Shower Doors In Clawson, MI

Glass is one of the last things to go into a new house, which puts it in the worst seat on the schedule. It cannot begin until the room is finished, and it inherits every delay in front of it. Here is how the glass should sit in your Clawson build, what has to be done before a tape can come out, and the two notes that belong on the framing plan.

Call (586) 315-8900
New construction in Clawson

Call Us Three Times, Not Once

Most of the trouble we see on a new build traces back to a single phone call placed too late. Glass sits behind every wet trade on the schedule and behind the cabinet installer as well, and any one of them can slide without anybody thinking to tell the glass company. Three calls solve it. One while the walls are still open. One when the tile is finished and dry. One to set the install date once the room belongs to you again. The first is the call most builders skip, and it is the only one that changes what the finished bathroom is able to be.

Two items belong on the framing plan, and both are simple at that stage and awkward afterward. The first is solid blocking behind the tile anywhere a hinge or a clip will land. A tall panel pulls against that wall every time somebody opens the door, and there is no frame spreading the load out, which is precisely the trade a buyer accepts when the spec calls for frameless shower doors in Clawson. The second is the swing. Decide which way the door opens, test that arc against everything already drawn near it, then test it again once the vanity is final. Both of those are pencil work now and demolition later.

If the house has more than one bathroom, set the enclosure type and the hardware finish once and carry that decision into every opening. After that the only variable left is the size of each room, your selections file stays short, and a buyer walks through reading one standard instead of three unrelated ones. Bathrooms that do not repeat are not an exception to that. Corners, angled walls, benches and return panels are what custom glass shower enclosures in Clawson exist for, built to the shape you framed, so the spec survives even where the footprint does not.

How we work with you

What The Job Site Has To Give Us

01

Two Visits, Two Access Windows

The measure and the install are separate trips with fabrication between them, because the panels are cut to your openings instead of pulled off a shelf. Both trips need somebody to open the house and a room clear enough to work in. On a locked build, settle how access works before the day rather than at the curb.

02

A Finished Shower Is Not Storage

The moment the tile is grouted and the curb is set, that opening is a finished surface, and every number we take comes off it. Buckets, saw stands and stacked boxes sitting in a finished pan chip curbs and scuff walls. A chipped curb found after the measure becomes a conversation nobody enjoys at the walkthrough.

03

Hardware Rides With The Trim Order

Enclosure hardware has to live next to plumbing trim, and trim gets ordered early on most builds. Choose the shower finish alongside the valve trim instead of after it shows up on site. We offer a full range of finishes and will hold them against your trim sample before anything is committed.

Shower enclosure by Fortune Shower Doors in a Clawson, Michigan bathroom
Sequencing

Where A Build Actually Stalls

The sequence is dull enough to write on a napkin. Frame with blocking in and the swing marked, waterproof, set the pan and curb, tile, measure, fabricate, install. Jobs do not stall inside those steps, they stall at the seams between them, and three seams cause most of it. Nobody mentioned the house until the punch list was already typed. The curb or a knee wall moved after we measured. Or the tile went up leaning far enough to argue with the style somebody already showed a buyer. That last one is ordinary work rather than a crisis, because we measure the wall as built and cut to it. Where a wall leans further than a full frameless run will hide, semi-frameless shower doors in Clawson give the opening more structure to work with, and you will hear that at the measure rather than at delivery.

Anything that moves after the measure deserves a phone call. A second bed of thinset, a curb rebuilt taller, a niche relocated, and the numbers sitting in our shop no longer describe your room. Tell us and we come back and take them again. A panel is made to one set of dimensions and it will not negotiate with a room that changed. On the day of glass shower door installation in Clawson we need the shower empty, the finished floor protected and no other trade working in that space, because heavy glass is placed by hand and a chipped edge gets no second attempt. The people setting it are the same family who measured the opening and built the panels, and none of that is handed to a subcontractor.

  • Blocking set behind the tile wherever hinges and clips land
  • Swing direction settled on the framing plan and tested in the room
  • Waterproofing, pan and curb finished before a tape comes out
  • Tile grouted, walls final, nothing stored in the shower
  • One person named to approve final dimensions
  • Access arranged for the measure and again for install day
Good Questions

Common questions.

We are still framing. Is it too early to call you?

That is the call we actually want. With the walls open, blocking behind the tile and the door swing are notes on a plan. Once tile is set, both turn into a compromise. You are not ordering anything at that stage and nothing has to be final. Tell us the house exists and what each bathroom is meant to be.

Can you build from our dimensions so we can order ahead?

We will talk styles, glass and hardware off your plans any day of the week. Fabrication is a different matter. Panels are cut to the opening the tile setter actually hands over, and that opening is rarely the one on the drawing. So the measure happens on site once tile is done, and everything is built from those numbers instead.

There are three bathrooms in this house. Do we decide three times?

Set one standard. Enclosure type and hardware finish chosen together for the whole house, and each bathroom becomes that standard at its own size. Every opening is still measured on its own, because two baths framed off the same page rarely finish the same, but you approve a single decision instead of three.

The buyer wants a say in the glass. How do we handle that?

Put a name and a due date on the selection. Buyer input is common and it is fine, but glass sits at the end of the build, so nothing behind it can absorb a choice that drifts. If the buyer is picking, we are glad to work with them directly with you copied in, as long as everyone agrees who holds the final word.

The tile is up and the wall is out of plumb. Now what?

Normal, and we build around it. Framers and tile setters each work to their own tolerances and the two do not always agree, so a panel is fabricated to the wall we measure rather than the wall on the drawing. There is a point where a lean becomes visible in the finished gap, and if your opening is near it you hear so on the spot.

Do you handle the pan, the waterproofing or the tile?

No. Framing, plumbing, waterproofing, the pan and the tile all belong to other trades, and every one of them finishes ahead of us. Our scope is the glass and its hardware, built in our own shop and set by our own family. We would rather own a narrow scope completely than a wide one partially.

Clawson, MI

Putting Up A House In Clawson?

Call while the walls are open and we will settle blocking and door swing before they turn into demolition. Once your tile is done, the in-home measure is free. Call (586) 315-8900, text (586) 800-9481, or email [email protected]. Showroom at 42624 Van Dyke Ave in Sterling Heights, Mon to Fri 9 to 5 and Sat 10 to 2.

Text Us a Photo Call (586) 315-8900
Text Us Call