Glass is one of the last trades through the door on a Warren build. Fortune measures the opening your trades actually built, fabricates it in our own shop, and installs with our own family crew.

Call (586) 315-8900
New construction in Warren

Glass Goes In Last, So Plan For It First

On a new build the shower enclosure is one of the last items on the schedule and one of the first things a buyer puts a hand on at the walkthrough. That combination is what makes it worth thinking about early. The install itself is short and clean. Almost everything that decides whether it goes smoothly happens well before we show up: where the blocking sits, how square the curb comes out, how the tile setter closes the wall, and whether anybody has actually decided what door belongs in that opening.

We do not measure off a plan. A shower opening on paper and the opening your trades build are rarely the same to the sixteenth, and heavy glass shows every bit of that difference. The field measure happens once the tile is set and grouted, the pan or curb is finished, and nobody is touching those walls again. Put it on the schedule as its own step rather than letting it ride along with the punch list. For a spec bath that has been built straight and plumb, frameless shower doors in Warren are the version that pays that work back, and custom glass shower enclosures cover the openings that are not a simple rectangle.

What we need from a Warren job site is short: finished tile, a dry and clear stall, light and power in the room, and one person who can confirm the swing and the finish. What you get back is a single accountable trade. Every panel is built in house by one family and never subcontracted, so the crew that measured is the crew that installs and there is nobody to point at if the fit is wrong. The mechanics of that visit sit on the glass shower door installation page. Where a slim top rail is the sensible call, semi-frameless shower doors forgive a little more movement in the opening.

How we work with you

What To Lock Down Before The Board Goes On

01

Blocking Behind The Hinge Wall

Heavy glass hangs on hinges, and hinges want something solid to bite. If a swing door is going in that opening, get blocking behind the board on the hinge wall while the framing is still open. It is trivial at that stage and impossible once the tile is on.

02

One Spec Across Every Bath

Running the same door style and the same hardware finish through a plan keeps the walkthrough simple and the punch list short. Give us the spec once and we hold it across every opening in the house, including the secondary baths where the footprint changes.

03

The Tile Sets The Ceiling

Glass can only be as true as the opening. A curb that pitches the wrong way, a wall that bows at the top, a niche that lands right where the hinge wants to go: all of it shows in the finished enclosure. We call it out at the measure while there is still time to deal with it.

Shower enclosure by Fortune Shower Doors in a Warren, Michigan bathroom
Sequencing

The Order That Keeps A Job From Stalling

The sequence that works is the same on every build. Framing goes in with blocking behind the hinge wall and the bench or niche located. Plumbing, waterproofing and the pan follow, all of it other trades' work. Tile is set and grouted. Paint is done. Then we measure, fabricate, and come back once to install. Two visits from us, and both of them need the stall clear, dry and lit.

The part that actually stalls jobs is approvals. Glass and hardware are a selection, and selections wait on somebody. Name one person who can confirm the swing direction and the finish, make the decision due before the tile goes in rather than after, and the enclosure stops being the item everybody is waiting on at the end. If something changes in the field, tell us before we cut. After that the glass is already yours, sized to that opening and nothing else.

  • Blocking behind the hinge wall at framing
  • Curb, pan and waterproofing closed out first
  • Tile set and grouted before we measure
  • Swing direction and hardware finish confirmed
  • Stall clear, dry and lit for both visits
  • One name on the approvals
Good Questions

Common questions.

When should I call for the measure on a new build?

Call when the tile is scheduled, and book the measure for after it is set and grouted. Measuring earlier means measuring a wall that is still going to move. Once the tile, the pan and the curb are finished and nothing else is being touched in that stall, the opening is real and we can build to it.

Can you work from our plans?

We can talk through what an opening like that takes from the drawings, which is useful early. The dimensions we actually build to come from the field measure, in the finished stall. Plan sets and framed walls disagree often enough that heavy glass cut from a drawing is a gamble nobody on the job wants to take.

What has to be done before we can measure?

Tile set and grouted, curb and pan finished, walls final, and nothing left to demo or patch in that stall. The room needs to be dry, clear enough to work in, and lit. Plumbing, waterproofing and tile are other trades' work, so we are simply the last one in behind them.

Who signs off on the glass and the hardware?

Whoever you tell us. On some jobs it is the builder holding a spec, on others it is the buyer picking a finish, and on plenty of jobs it is both. What matters is that it lands with one person. Selections that go around a group are the ones that sit unanswered while the rest of the house finishes.

The tile went in out of plumb. What now?

It happens, and it is not automatically a problem. Every panel is cut to the opening that exists rather than the one on paper, so a wall that leans slightly still gets a door that closes clean. We will tell you plainly at the measure what will show and what will not, before anything is fabricated.

Do you install before or after paint?

After. Glass belongs at the end of the schedule, once the painters are out and nobody is sanding, taping or spraying near it. Then it wants protecting through the rest of punch, because a finished enclosure standing in an open house is easy to knock and nobody wants to build it twice.