New Construction Shower Doors In Shelby Township, MI
Glass is one of the last trades into a bathroom and one of the first decisions that has to be made behind the drywall. If you are building in Shelby Township, here is where the shower enclosure belongs on your schedule, what has to be finished before we measure, and who signs off before anything gets cut.
Glass Goes In Last, So Plan For It First
On a new build the enclosure sits at the end of a long chain. Framing, plumbing rough-in, waterproofing and the pan, then tile, then grout. Glass is measured after all of it, on the finished surfaces, in the opening that actually exists. We do not measure studs, cement board, or a print. Tile thickness nobody accounted for is thickness the glass has to live with, and once a panel is tempered it cannot be trimmed on site.
The catch is that the earliest decision on the job lands months before that measure. Heavy panels and hinges have to bite into solid backing, and backing goes in while the walls are still open. If you know at framing that the primary bath is getting frameless shower doors in Shelby Township rather than a framed unit sitting on the jambs, we can tell your carpenter where blocking goes before the drywall crew ever arrives. That one conversation prevents the most expensive kind of change order, the kind that opens a finished wall.
The second thing to settle early is who decides. On a spec house you are choosing the glass, the finish and the layout, and you want one spec you can repeat. On a pre-sold house the buyer is choosing, and their selections have to be locked before we fabricate rather than after. Either way, custom glass shower enclosures in Shelby Township are built to one approved set of numbers and one approved finish. Tell us at the measure whose approval counts and we will chase that person instead of your super.
Three Things That Keep A Build Moving
Measure On Finished Tile
We field measure once the tile is set and grouted, the curb is finished and the wall work is done. That is the opening the glass gets cut to. If tile is still going in behind us, or a niche or bench is still being framed, the numbers move and the glass will not fit the room you hand over.
Blocking Before Drywall
Hinges, clips and header supports carry real weight, and they need something behind the tile to hold. Settle the door style while the walls are open and put backing where the hardware lands. Chasing support into a tiled wall later is the kind of punch item nobody on the job wants to own.
One Spec, Repeated
If you are building several baths, or several houses off the same plan, hold one glass thickness, one hardware finish and one layout logic across all of them. Selections go faster for your buyers, your trim carpenter and tile setter work to the same details, and the punch walk gets shorter.

What A Rough Opening Needs Before We Measure
The measure is a field appointment, not a formality. When we walk in, the shower has to be in its finished geometry: tile set and grouted on every wall the glass touches, curb or threshold tiled and pitched, bench and niche complete, and nothing left to shim behind the surfaces. The glass shower door installation that follows is only as true as what we measured, so anything still in motion costs you a second trip.
Walls in a new build run out of plumb more often than owners expect, and tile tends to amplify that rather than hide it. We check plumb across the full height of every wall the glass meets and cut the panels to the opening as it truly sits. If a run is far enough off that a bare glass edge would show a wedge of daylight, we say so at the measure and give you honest options, which sometimes means semi-frameless shower doors carrying a channel where it is needed.
- Tile set and grouted on every wall the glass meets
- Curb or threshold finished, pitched and tiled
- Bench, niche and knee wall complete, not still framed
- Backing already in the walls where hardware will land
- Hardware finish and glass approved by whoever decides
- One named decision maker and site access on install day
Common questions.
When Should I Bring You In On A New Build?
Twice. Once at framing, so we can tell your carpenter where blocking has to go for the door style you are planning, and again when the tile is finished, for the field measure the glass is actually cut from. Builders who only call at the second point are the ones who end up opening a finished wall.
Can You Measure From The Plans Or The Tile Layout?
No. Prints tell us what to expect, not what to cut. Framing moves, tile thickness varies, and a curb rarely lands exactly where it was drawn. Every panel is cut from a field measure taken on finished surfaces. Send the drawings ahead if you have them and we will read them, but the numbers come from the room.
The Tile Went In Out Of Plumb. What Happens Now?
We measure it as it sits and build to that reality rather than to the ideal rectangle. There is a limit to how much lean a frameless panel absorbs before you can see it, and we tell you at the measure which side of that limit you are on, while your tile setter is still on the job and the decision is still cheap.
Where Does Blocking Go, And When Do You Need To Know?
Behind the hinge side, behind any header or support bar, and behind the clips that hold a fixed panel. We need to know before drywall, which means the door style has to be settled at framing. Call the showroom while the walls are open and we will walk the layout with whoever runs your carpentry.
Can You Hold The Same Spec Across Every Bath In The House?
Yes, and it is worth doing. One glass thickness, one hardware finish and one set of details across the primary, the hall bath and the guest bath keeps the house reading as one house. We record the spec at the first measure so the later baths do not turn into a fresh round of decisions.
When In The Punch List Should The Glass Go In?
After the trades that would damage it. Paint, flooring and the wet trades come first. Glass is one of the last items installed and one of the easiest to chip, so schedule it late, keep foot traffic out of the room afterward, and put the final clean after us rather than before.
Put The Glass On Your Schedule Early
Call the showroom while the walls are still open, or bring us in when the tile is done. Fortune measures, builds and installs Shelby Township work from the Sterling Heights showroom on Van Dyke, with a free measure and a written quote. Call (586) 315-8900 or text (586) 800-9481.